This is the covering of bare ground with a layer of turf which is a combination of grass, a thin layer of soil and roots. This installation is used in fields that need ground cover either immediately or temporarily. Sod is mostly used in areas where the ground cover has dried up and is likely not to grow again. It is effective in controlling soil erosion and floods. To find companies that specialize in Commercial Sod Installation Minnesota deserves prioritization.
Installing sod is a sequential process and is very important for one to follow the steps used when installing. Properly installing the sod results in good establishment and it is able to adapt to the new environment. Drying and destruction of the sod is a clear indication that the turf was not installed properly according to the procedure.
Before taking any step, it is often advisable to take soil samples for testing. Soil around the area of interest should be properly tested to determine factors as the pH. Most turf thrives in areas where the soil is slightly acidic. Solis with good aeration have a fantastic history as far as turf lifespan is concerned.
The next step is now to measure the area in which the sod is to be laid. To avoid ordering excess turf from manufacturers measuring is one way which can be used because it also has some economic advantages to the owner. When ordering sod required for installing, more than the actual size of the field to be covered should be acquired. This is because the sod which would remain after installing will act as a backup whenever damage occurs when installing.
Organic fertilizer plays a very crucial role in the well-being of the sod. Manure provides the necessary nutrients for the turf to grow faster and become greener as well. Manure should be incorporated into the soil to form a uniform mixture before the turf can be installed. However, Manure application should be regulated as excess application can scorch the sod instead.
After the application of manure the ground is leveled afterwards. This is significant as it ensures that the turf grows on uniform ground level making it to be attractive. There are different methods used in leveling the ground and the use of rake is considered the most suitable method. However other means such as manual spreading can also be applicable here if done correctly.
Turf placement comes after the leveling. The turf is unrolled carefully while it is placed on the ground in order to avoid any damages. The unrolled turf is laid on the field. The throwing of turf in different manners should be discouraged as it can destroy the root system of the sod. In case of the need to change ones position it advisable to carry the turf than to grad it as it might be spoiled in the process.
In the course of installing of the sod joints appear between the turfs. These joints should be filled after the proper installation of the sod. The joints are filled with pieces of sod that are cut according to the size and shape of the joint. The laid turf may have some extension and these need to be cut off. Watering is the last thing and is vital for sod growth.
Installing sod is a sequential process and is very important for one to follow the steps used when installing. Properly installing the sod results in good establishment and it is able to adapt to the new environment. Drying and destruction of the sod is a clear indication that the turf was not installed properly according to the procedure.
Before taking any step, it is often advisable to take soil samples for testing. Soil around the area of interest should be properly tested to determine factors as the pH. Most turf thrives in areas where the soil is slightly acidic. Solis with good aeration have a fantastic history as far as turf lifespan is concerned.
The next step is now to measure the area in which the sod is to be laid. To avoid ordering excess turf from manufacturers measuring is one way which can be used because it also has some economic advantages to the owner. When ordering sod required for installing, more than the actual size of the field to be covered should be acquired. This is because the sod which would remain after installing will act as a backup whenever damage occurs when installing.
Organic fertilizer plays a very crucial role in the well-being of the sod. Manure provides the necessary nutrients for the turf to grow faster and become greener as well. Manure should be incorporated into the soil to form a uniform mixture before the turf can be installed. However, Manure application should be regulated as excess application can scorch the sod instead.
After the application of manure the ground is leveled afterwards. This is significant as it ensures that the turf grows on uniform ground level making it to be attractive. There are different methods used in leveling the ground and the use of rake is considered the most suitable method. However other means such as manual spreading can also be applicable here if done correctly.
Turf placement comes after the leveling. The turf is unrolled carefully while it is placed on the ground in order to avoid any damages. The unrolled turf is laid on the field. The throwing of turf in different manners should be discouraged as it can destroy the root system of the sod. In case of the need to change ones position it advisable to carry the turf than to grad it as it might be spoiled in the process.
In the course of installing of the sod joints appear between the turfs. These joints should be filled after the proper installation of the sod. The joints are filled with pieces of sod that are cut according to the size and shape of the joint. The laid turf may have some extension and these need to be cut off. Watering is the last thing and is vital for sod growth.